• Existing user of old message board?

    Your username will have transferred over to this new message board, but your password will need to be reset. Visit our convert your account page, to transfer your old password over.

Season tickets 2025/6

It does bother me the news that they will now need to move everyone out of the old stand before working on the new stand. Originally they were going to build up / over and around the old stand allowing season ticket holders and others to stay. Now they will have to find seats / areas to move everyone from there? That’s why I expect they haven’t issued our season tickets yet. I hope we all get our existing seats but I’m not sure how they can do this without causing us existing season ticket holders around the ground a lot of pain?
That could well be it, I'm sure it would be cheaper just to bulldoze the old stand and start from ground up, certainly quicker.
That would mean moving elsewhere for a season.
 
I would imagine that from early Monday morning the club admin are scouring other club websites to see what they have published in terms of format / ticket offerings for - Season ticket renewal / Community Shield / Europa home & away / etc, etc & trying to see how it could mesh together (to give the appearance of something structured & well thought out) before they publish any blurb.
 
Apparently you have to pay £10 to get on the ST waiting list. Is this correct,and how do i know where the seats would be??

You get £10 off your season ticket if offered the chance to purchase. You’d choose your seat then. Not everyone on waiting list will get the chance to buy, depends how many don’t renew etc
 
I believe the minimum size of the pitch that is required in European competition is 110 yards x 70 yards.
Selhurst Park pitch is shown to be 101 yards x 68 yards. Therefore it is too short by 9 yards,and too narrow by 2 yards to host European events

Even without the problems that the proposed old/new stand generates with a possible reduction in capacity,we now have a problem of a 9 yard shortage of pitch which would certainly reduce the ground capacity and therefore the amount of season tickets available.

I think that is why we are all waiting for a ST renewal date.Unless someone know different.
 
I believe the minimum size of the pitch that is required in European competition is 110 yards x 70 yards.
Selhurst Park pitch is shown to be 101 yards x 68 yards. Therefore it is too short by 9 yards,and too narrow by 2 yards to host European events

Even without the problems that the proposed old/new stand generates with a possible reduction in capacity,we now have a problem of a 9 yard shortage of pitch which would certainly reduce the ground capacity and therefore the amount of season tickets available.

I think that is why we are all waiting for a ST renewal date.Unless someone know different.
I think that 101 by 68 is metres so we’re ok on yardage.
 
I believe the minimum size of the pitch that is required in European competition is 110 yards x 70 yards.
Selhurst Park pitch is shown to be 101 yards x 68 yards. Therefore it is too short by 9 yards,and too narrow by 2 yards to host European events

Even without the problems that the proposed old/new stand generates with a possible reduction in capacity,we now have a problem of a 9 yard shortage of pitch which would certainly reduce the ground capacity and therefore the amount of season tickets available.

I think that is why we are all waiting for a ST renewal date.Unless someone know different.
For the UEFA Europa League, the dimensions of a football pitch must be between 100 and 105 meters long, and 64 and 68 meters wide.

The Selhurst Park pitch is 101 meters long and 68 meters wide

No issues at all ......
 
For the UEFA Europa League, the dimensions of a football pitch must be between 100 and 105 meters long, and 64 and 68 meters wide.

The Selhurst Park pitch is 101 meters long and 68 meters wide

No issues at all ......
Requirement for league stage games onwards is: 105 m long, 68 m wide (115 yd × 74 yd). Automated under-soil pitch irrigation system and pitch heating and/or pitch cover (depending on the location and climate) must be available.

The "100-105m" only applies to the qualifying rounds (which we aren't in)
 

Holmesdale Online Shop

Back
Top